Consulting service on refining business
- HOME
- Consulting service on refining business
Construction of business model
(new business proposal for refining business)

Contents of consulting service
- Guidance and teaching on smelting technology and theoretical study (in cooperation with Tohoku Univ. and several other companies)
- Operation and guidance on smelting equipment, safety management, and implementation of production process
- Production guidance by resident instructors and technical experts
- Invitation of smelting engineers, implementation of production work and training of workers(and implementation of special short-term classes for chief engineers)
- Purchasing raw materials from suppliers
- Preparation for secondary- processed products and guidance on education and production methods
- Preparation for collaboration with industry-academia and cooperation with university research institutions
- Securing sales channels for primary and secondary products
- Guidance on obtaining various approvals and licenses (e.g. ISO) required for smelting plant
- Learning guidance for workers to obtain qualifications
- Based on the above, counselling on productivity improvement in line with the current situation, including various advices on management of the refinery
The Process from consulting contract to production start (First phase only)
- Consulting contract: agreement on details of the quotation
- Start ordering equipment : Receive payment for equipment ( we will make arrangements for custom-made equipment)
- Start preparation for the installation of plant equipment: Inviting technical workers
- Arrangement through our route: Arrangement of various raw materials and data collection by outsourcing
- Start trial operation of equipment: adjustment of equipment operation
- Start collaboration with universities: start plant visits and exchanges of professors and researchers
- Start production of primary products: Secure sales channels and start buying and sales (Mainly to member stores of Japan Gold Metal Association)
- Preparation for production of secondary products and materials
About preparation and arrangement of plant
- Installation work for gas, electricity, water supply and drainage (design and construction)
- Wastewater neutralization facility (design and construction)
- Installation of small-sized power generator (electrical wiring work)
- Equipment layout plan
- Design and construction of custom‐made equipment
- Others: Including installation trial run and visit of trainee on site, etc
Flow of Business model building
STEP01
First phase
-From installation to operation of the smelting plant
(Promoting efficiency through the introduction of our original sorting machine)
-3 years investment and monthly trial balance sheet (simulation) See→XX
STEP02
Second phase
– From installation to operation of secondary processing plant (processing of products such as palladium film)
STEP03
Third phase
– Entering the hydrogen business
-Until development, production, and sales of hydrogen purification, storage, and transportation equipment
STEP04
Fourth phase
-Until gaining ISO certification, original Hallmark and joining the Bullion Association